2018
Myanmar has a population of about 51.4 million, 70% of which are rural residents, and 84% of rural households are located in areas without electricity. The annual electricity demand and consumption of residents are growing rapidly. At the same time, due to the heavy dependence on seasonal hydropower generation, the existing power generation system cannot meet the peak demand in the dry season. Although the gas power generation in Myanmar has increased slightly in recent years, the reliability and coverage of the overall power supply are still low. Power shortage and power interruption are the main problems in Myanmar. At the same time, power shortage limits the economic development of Myanmar, and the basic life of the people cannot be better improved.
SINOSOAR adheres to the corporate mission of “Power the World with Hybrid Energy” and since 2016, SINOSOAR has been serving Myanmar off-grid project. In 2018, SINOSOAR has completed the Project ‘Bago Additional’ for design, supply, installation of 6,194 sets of solar systems and the user training. This project has brought lights for nearly 50 villages and over 6,000 household families, it will help them to light their house in the dark night, charge mobile phone and watch TV. SINOSOAR’s professional attitude and sense of responsibility were highly recognized by the Myanmar government.
After the completion of installation, SINOSOAR set up 1 maintenance stations in Myanmar to continue supplying high quality service, and it will also provide many job positions for local people.
[News flash] Congratulations on Sinosoar’s successful HSE certification specialized in solar mini-grid engineering works!